| Hydrogen Import Terminal Wilhelmshaven HITW | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Uniper Hydrogen GmbH | Uniper Technologies GmbH | ||||||||
| FEED ITT - List of Deliverables | |||||||||
| Auftraggeber / Endkunde / Client: Uniper Hydrogen GmbH Holzstr. 6 40221 Düsseldorf | |||||||||
| Auftragnehmer / Kontraktor / Contractor: Uniper Projects GmbH Alexander von Humboldt Str. 1 45896 Gelsenkirchen | |||||||||
| Ingenieurdienstleister / Engineering Subcontractor: | |||||||||
| Projekt No. / Project Nr.: | |||||||||
| Endkunde / Client Document No.: HITW-UNI-GE-AAB010-0001 | Phase: Phase: | FEED | |||||||
| DCC Bereich/Schlüssel: DCC Area/Key: | AAB010 | ||||||||
| Kontraktor / Contractor Document No.: | Dok.-typ: Doc.-Type: | List of Deliverables | |||||||
| Zweck: Purpose: | Issued for tender | ||||||||
| Ingenieurdienstleister / Eng. subcontractor Document ID: | Vertraulichkeit: Confidentiality: | Public | |||||||
| Disziplin: Discipline: | General Engineering | ||||||||
| Weitere Hinweise und Bemerkungen / Further notes and remarks: | |||||||||
| Rev. | Änderung / Beschreibung - Change / Description | Status / Status | Datum / Date | ||||||
| 00 | Issued for ITT | Released | 29.06.2026 | ||||||
| Erstellt von / Created by | Geprüft von / Reviewed by | Geprüft von / Reviewed by | Geprüft von / Reviewed by | Freigegeben von / Approved by | |||||
| Name / Signatur: Name / Signature: L. Kivilip (I.A.) T. Groening Thorsten Gröning Thorsten Gröning (Jul 2, 2026 08:36:53 GMT+2) | Name / Signatur: Name / Signature: E. Ernst (I.A.) T. Groening Thorsten Gröning | Name / Signatur: Name / Signature: M. Töpfer Marcel Töpfer | Name / Signatur: Name / Signature: | Name / Signatur: Name / Signature: T. Groening Thorsten Gröning Thorsten Gröning (Jul 2, 2026 08:36:53 GMT+2) | |||||
| Thorsten Gröning (Jul 2, 2026 08:36:53 GMT+2) | Marcel Töpfer (Jul 2, 2026 07:47:22 GMT+2) | ||||||||
| Funktion / Abteilung: Function / Department: Eng.Man. | Funktion / Abteilung: Function / Department: Lead Process Engineer | Funktion / Abteilung: Function / Department: Lead Mechnical & Piping | Funktion / Abteilung: Function / Department: | Funktion / Abteilung: Function / Department: TPM | |||||
| © 2023 Uniper SE - All rights reserved |
ebb_26_78434781_3549076486
| DELIVERABLE | ITT Scope of Work chapter | DESCRIPTION / NOTES / CORRESPONDING REFERENCES | R I S S F I s Ay L C a d 7 | x II R F S I S s A L C y a d 4 1 | III S SIF AI L C |
|---|---|---|---|---|---|
| PROJECT MANAGEMENT & GENERAL ENGINEERING | 10.1 | ||||
| Project Design Basis | 10.1.1 | X | |||
| Project Site Visit and report | 10.1.2 | X | |||
| Master Document Register (MDR) | 10.1.3 | X | |||
| EPC Project Execution Plan | 10.1.4 | X | |||
| EPC Schedule | 10.1.5 | X | |||
| Cost Estimate Basis and Methodology | 10.1.6.1 | X | |||
| CAPEX Estimate and Report | 10.1.6.2 | X | |||
| OPEX Estimate and Report | 10.1.6.3 | X | |||
| Project Risk Management Procedure and Plan | 10.1.7 | X | |||
| Project Risk Register | 10.1.8 | X | |||
| Interface Register | 10.1.9 | X | |||
| List of codes, standards and regulations | 10.1.10 | X | |||
| Terminal-FEED Study Report | 10.1.11 | X | |||
| Logistics, Infrastructure & Transportation Study | 10.1.12 | X | |||
| Plant Layout Philosophy and Review Report | 10.1.13 | X | |||
| Overall Plot Plan and Key Plan | 10.1.14 | X | |||
| Plot Plans | 10.1.15 | X | |||
| 3D Model | 10.1.16.1 | X | |||
| 3D Model Development Plan | 10.1.16.2 | X | |||
| 3D Model Review Report | 10.1.16.3 | X | |||
| Project Phasing Report | 10.1.17 | X | |||
| Project Description | 10.1.18 | X | |||
| PROJECT CONTROLS | 10.2 | ||||
| FEED Project Execution Plan | 10.2.1 | X | |||
| Terminal-FEED Organisation Chart | 10.2.2 | X | |||
| Communication and Coordination Procedure | 10.2.3 | X | |||
| Terminal-FEED Study Schedule | 10.2.4 | X | |||
| Quality Assurance Plan | 10.2.5 | X | |||
| PROCUREMENT | 10.3 | ||||
| EPC Procurement Execution Plan | 10.3.1 | X | |||
| Vendor List | 10.3.2 | X | |||
| Subcontracts List for consultancy services | 10.3.3 | X | |||
| List of Long Lead Items | 10.3.4 | X | |||
| Enquiry Requisition and Invitation to Tender | 10.3.5 | X | |||
| Technical Bid Evaluations | 10.3.6 | X | |||
| CONSTRUCTION | 10.4 | ||||
| Temporary Facilities Report | 10.4.1 | X | |||
| Construction Philosophy | 10.4.2 | X | |||
| Constructability Study | 10.4.3 | X | |||
| Construction Equipment Study | 10.4.4 | X | |||
| Construction Equipment Emission Drawing | 10.4.5 | X | |||
| Heavy Lift Study | 10.4.6 | X | |||
| AMMONIA STORAGE TANKS | 10.5 | ||||
| Ammonia Storage Tank Assessment and Report | 10.5.1 | X | |||
| Ammonia Storage Tank Data Sheets | 10.5.2 | X | |||
| Ammonia Tank General Arrangement Drawing | 10.5.3 | X | |||
| Ammonia Storage Tank Isometric views and 3D-model views | 10.5.4 | X | |||
| Ammonia Storage Tank Foundation Drawing | 10.5.5 | X | |||
| Ammonia Storage Tank Specification | 10.5.6 | X | |||
| Ammonia Tank Capacity Check | 10.5.7 | X | |||
| Ammonia Boil-off Gas Liquefaction | 10.5.8 | X | |||
| NH3 Storage Tanks Fabrication, Inspection and Maintenance Philosophy | 10.5.9 | X | |||
| HSSE & Design Safety | 10.6 | ||||
| General Design Safety and HSSE Philosophy | 10.6.1 | X | |||
| Preliminary Safety Critical Equipment List | 10.6.2 | X | |||
| Emission Monitoring Description | 10.6.3 | X | |||
| Emission, Effluents, Waste Summaries and Material Register | 10.6.4 | X | |||
| Emission, Effluents, Waste Plan | 10.6.5 | X | |||
| Source plan of air pollutant emissions and odours | 10.6.6 | (Quellenplan luftverunreinigende Stoffe und Gerüche) | X | ||
| Waste Management Plan | 10.6.7 | X | |||
| Lists of substances/mixtures hazardous to water and related facilities | 10.6.8 | X | |||
| List of chemical substances | 10.6.9 | X | |||
| Wastewater Report | 10.6.10 | X | |||
| Report for the water law application | 10.6.11 | X | |||
| Greenhouse Gas Emission Summary | 10.6.12 | X | |||
| EscapeandRescueMethodologyandLayoutsandPlans/SafetyFacilities Layouts | 10.6.13 | X | |||
| Fire Protection Design Philosophy | 10.6.14 | X | |||
| Fire Zone and Firewater Demand Report | 10.6.15 | X | |||
| Fire Zone Plan | 10.6.16 | X | |||
| Firewater Ring Main Hydraulic Analysis Report | 10.6.17 | X | |||
| Fire Protection Layout Drawings | 10.6.18 | X | |||
| Fire & Gas Detection Layout Drawings | 10.6.19 | X |
Printed: 01.07.2026 2 / 6
ebb_26_78434781_3549076486
| DELIVERABLE | ITT Scope of Work chapter | DESCRIPTION / NOTES / CORRESPONDING REFERENCES | R I S S F I s Ay L C a d 7 | x II R F S I S s A L C y a d 4 1 | III S SIF AI L C |
|---|---|---|---|---|---|
| Fire Protection Concept (Brandschutz Konzept) | 10.6.20 | DocumentpreparedbyEmloyer(noTerminal-FEEDContractordeliverable),but supported by Terminal-FEED contractor's deliverables and input | |||
| Gas dispersion, Radiation and Explosion Assessment and Report | 10.6.21 | X | |||
| Fire Alarm System and Gas detection Philosophy | 10.6.22 | X | |||
| Preliminary Explosion Protection Concept | 10.6.23 | X | |||
| Spill Prevention and Response Philosophy | 10.6.24 | X | |||
| Spill Prevention and Response Report and Layout Drawings | 10.6.25 | X | |||
| AwSV Expert Report and Opinion | 10.6.26 | DocumentpreparedbyEmloyer(noTerminal-FEEDContractordeliverable),but supported by Terminal-FEED contracto's deliverables and input | |||
| Hazardous Area Classification Report and Layout Drawings | 10.6.27 | X | |||
| HAZID Study and HAZID Report | 10.6.28 | X | |||
| HAZOP and HAZOP Report | 10.6.29 | safety requirement | X | ||
| SIL/LOPA Report | 10.6.30 | X | |||
| Quantitative Risk Assessment | 10.6.31 | X | |||
| Noise Emission Schedule & Plan | 10.6.32 | X | |||
| Description of Noise Reduction Measures | 10.6.33 | X | |||
| Functional Specifications for Emergency Vehicles | 10.6.34 | X | |||
| Safety,Health,and EnvironmentalActionManagementSystem(SEAMS) Register | 10.6.35 | X | |||
| Physical security concept | 10.6.36 | X | |||
| MECHANICAL & PIPING | 10.7 | ||||
| Mechanical & Piping Philosophy and Design Basis | 10.7.2 | X | |||
| Mechanical & Piping Specifications | 10.7.3 | X | |||
| Pipe Stress Analysis and Report | 10.7.4 | X | |||
| Pipe Material Specification Class Index | 10.7.5 | X | |||
| Pipe Material Class Specification | 10.7.6 | X | |||
| Piping Valve Selection Philosophy | 10.7.7 | X | |||
| General Specification for Pipe Supports including cryogenic Pipe supports | 10.7.8 | X | |||
| Technical Specification for Valves for LLI | 10.7.8 | X | |||
| Technical Specification for Valves for Cryogenic and Toxic applications | 10.7.8 | X | |||
| Technical Specifications for Valves butterfly, ball valves, gate valves, control valves, globe valves etc. larger than DN25 | 10.7.8 | X | |||
| Technical Specification for Tubing (e.g. SWAGELOK) | 10.7.8 | X | |||
| Valve data sheets | 10.7.9 | X | |||
| Inspection and Test Plans (LLI) | 10.7.10 | X | |||
| Painting and Coating Philosophy and Specification | 10.7.11 | X | |||
| Insulation Philosophy | 10.7.12 | X | |||
| Insulation Specification | 10.7.13 | X | |||
| Locked closed/open register | 10.7.14 | X | |||
| Line sizing calculations report | 10.7.15 | X | |||
| Corrosion Protection Philosophy | 10.7.16 | X | |||
| Maintenance Philosophy for Structures, pipelines, static mechanical | 10.7.17 | X | |||
| Mechanical Handling Philosophy | 10.7.18 | X | |||
| Condition Monitoring and Performance Monitoring Philosophy | 10.7.19 | X | |||
| List of interfaces (piping) | 10.7.20 | X | |||
| Valve List | 10.7.21 | X | |||
| Support list | 10.7.22 | X | |||
| MTO (material take off) - Pressure bearing and related parts | 10.7.23 | X | |||
| MTO (material take off) - Pipe Supports and secondary steel | 10.7.23 | X | |||
| MTO (material take off) - Insulation | 10.7.23 | X | |||
| System Isometric drawings | 10.7.24 | X | |||
| Isometric drawings | 10.7.25 | X | |||
| HVAC | 10.8 | ||||
| HVAC Design Philosophy | 10.8.1 | X | |||
| HVAC Basic Equipment Specification | 10.8.2 | X | |||
| HVAC Equipment List and Utility Load List | 10.8.3 | X | |||
| HVAC Control Philosophy | 10.8.4 | X | |||
| Basic Equipment Heat Dissipation List | 10.8.5 | X | |||
| HVAC Flow diagrams | 10.8.6 | X | |||
| HVAC Design Calculations | 10.8.7 | X | |||
| Preliminary Data sheets for major HVAC equipment | 10.8.8 | X | |||
| ELECTRICAL | 10.9 | ||||
| Electrical Basis of Design | 10.9.3 | X | |||
| List of Rules, Directives, Norms, Standards and Regulations | 10.9.4 | X | |||
| Electrical Interface Definition Document | 10.9.5 | X | |||
| Electrical Design Philosophy | 10.9.6.2 | X | |||
| Power Distribution and Control Philosophy | 10.9.6.3 | X | |||
| Electrical Protection Philosophy | 10.9.6.4 | X | |||
| Earthing and Lightning Protection Philosophy | 10.9.6.5 | X | |||
| Lighting Philosophy | 10.9.6.6 | X | |||
| Heat Tracing Philosophy | 10.9.6.7 | X | |||
| Cable Sizing Philosophy | 10.9.6.8 | X | |||
| Earthing and Lightning Protection System Design | 10.9.7 | X | |||
| Earthing System Design Requirements | 10.9.7.1 | X | |||
| Earthing Single Line Diagram | 10.9.7.2 | X | |||
| Lightning Protection System | 10.9.7.3 | X | |||
| Surge Protection Concept | 10.9.7.4 | X | |||
| Electrical Load List | 10.9.8 | X | |||
| Overall Single Line Diagram | 10.9.9 | X |
Printed: 01.07.2026 3 / 6
ebb_26_78434781_3549076486
| DELIVERABLE | ITT Scope of Work chapter | DESCRIPTION / NOTES / CORRESPONDING REFERENCES | R I S S F I s Ay L C a d 7 | x II R F S I S s A L C y a d 4 1 | III S SIF AI L C |
|---|---|---|---|---|---|
| Emergency Power Single Line Diagram | 10.9.9 | X | |||
| AC UPS Single Line Diagram | 10.9.9 | X | |||
| DC UPS Single Line Diagram | 10.9.9 | X | |||
| Switchboard Schedules | 10.9.9.6 | X | |||
| Layout plans for electrotechnical components in buildings | 10.9.10 | X | |||
| Cable Routing and Racking Layout Study | 10.9.10.7 | X | |||
| Power System Study | 10.9.11.2.1 | X | |||
| Harmonic Analysis Study | 10.9.11.2.2 | X | |||
| Emergency Power System Study | 10.9.11.2.3 | X | |||
| Cable Sizing Calculations | 10.9.12 | X | |||
| Lighting Calculations | 10.9.13 | X | |||
| Cathodic Corrosion Protection System Functional Report | 10.9.14 | X | |||
| Lighting System Design | 10.9.15 | X | |||
| Lighting Layout Study | 10.9.16 | X | |||
| Electrical Cable List | 10.9.17 | X | |||
| Electrical Equipment Specifications and Data Sheets | 10.9.18 | X | |||
| Electrical Equipment Schedule | 10.9.18.4 | X | |||
| Preliminary Electrical Typicals | 10.9.19 | X | |||
| Electrical Component Design Report | 10.9.20 | X | |||
| INSTRUMENTATION AND CONTROL | 10.10 | ||||
| Bus Layout Drawing | 10.10.4.8 | X | |||
| Instrumentation and Control Philosophy | 10.10.7.1 | X | |||
| IACS (Industrial Automation and Control System) Specification | 10.10.7.2 | X | |||
| SuitabilityAssessmentoftheSIEMENSPCS7asProcessControlSystem of the Terminal | 10.10.7.3 | X | |||
| BPCS- System Specification Document (SSD) | 10.10.7.4 | X | |||
| Functional Software Design Specification | 10.10.7.5 | X | |||
| Instrument and Actuator Register | 10.10.7.6 | X | |||
| Field Instrument Specifications | 10.10.7.7 | X | |||
| Interface Specification for Package Units | 10.10.7.8 | X | |||
| I/O List | 10.10.7.9 | X | |||
| Instrument Specification for Packaged Equipment | 10.10.7.10 | X | |||
| Process Analyser Specification | 10.10.7.11 | X | |||
| Register for Safety Instrumented Functions (SIF) | 10.10.7.12 | X | |||
| SIL Verification Report | 10.10.7.13 | X | |||
| SRS Requirement Specification | 10.10.7.14 | X | |||
| Preliminary SIS Architecture Diagram | 10.10.7.15 | X | |||
| Human-Machine-Interface Specification | 10.10.7.16 | X | |||
| Alarm Management Specification | 10.10.7.17 | X | |||
| Network Topology Diagram | 10.10.7.18 | X | |||
| System Architecture Block Diagram | 10.10.7.19 | X | |||
| Metering Philosophy | 10.10.7.20 | X | |||
| Control Room Layout Drawings | 10.10.7.21 | X | |||
| Control Building Equipment Layouts | 10.10.7.22 | X | |||
| High-level Security Concet OT | 10.10.7.23 | X | |||
| TELECOMMUNICATIONS, SECURITY TECHNOLOGY AND IT | 10.11 | ||||
| Hazard Management System - Specification | 10.11.1 | X | |||
| Hazard Management System - Block Diagram | 10.11.1 | X | |||
| Hazard Management System - Services and Supplies List | 10.11.1 | X | |||
| Hazard Management System - Documentation List | 10.11.1 | X | |||
| Fire Alarm System - Specification | 10.11.2 | X | |||
| Fire Alarm System - Block Diagram | 10.11.2 | X | |||
| Fire Alarm System - Services and Supplies List | 10.11.2 | X | |||
| Fire Alarm System - Documentation List | 10.11.2 | X | |||
| Fire Alarm System - Interface Description | 10.11.2 | X | |||
| Electroacoustic Alarm System - Specification | 10.11.3 | X | |||
| Electroacoustic Alarm System - Block Diagram | 10.11.3 | X | |||
| Electroacoustic Alarm System - Services and Supplies List | 10.11.3 | X | |||
| Electroacoustic Loudspeaker System - Documentation List | 10.11.3 | X | |||
| Electroacoustic Alarm System - Interface Description | 10.11.3 | X | |||
| Perimeter Protection/Surveillance - System Specification | 10.11.4 | X | |||
| Perimeter Protection/Surveillance - Block Diagram | 10.11.4 | X | |||
| Perimeter Protection/Surveillance - Services and Supplies List | 10.11.4 | X | |||
| Perimeter Protection/Surveillance - Documentation List | 10.11.4 | X | |||
| Perimeter Protection/Surveillance - Interface Description | 10.11.4 | X | |||
| GasWarningSystem-ProposalsonadditionalrequirementstotheUniper Standard | 10.11.5 | X | |||
| Gas Warning System - Block Diagram | 10.11.5 | X | |||
| Gas Warning System- - Documentation List | 10.11.5 | X | |||
| Gas Warning System - Interface Description | 10.11.5 | X | |||
| Gas Warning System - Services and Supplies List | 10.11.5 | X | |||
| BOS/TETRA System - Supplemented Concept | 10.11.6 | X | |||
| BOS/TETRA System - Block Diagram | 10.11.6 | X | |||
| BOS/TETRA System - Documentation List | 10.11.6 | X | |||
| BOS/TETRA System - Interface Description | 10.11.6 | X | |||
| BOS/TETRA System - Bill of Quantities | 10.11.6 | X | |||
| Passive IT/OT Network Structure/Access Control/Telephony- Supplemented Concept | 10.11.7 | X | |||
| Passive IT/OT Network Structure/Access Control/Telephony- Block Diagram | 10.11.7 | X | |||
| Passive IT/OT Network Structure/Access Control/Telephony - Documentation List | 10.11.7 | X |
Printed: 01.07.2026 4 / 6
ebb_26_78434781_3549076486
| DELIVERABLE | ITT Scope of Work chapter | DESCRIPTION / NOTES / CORRESPONDING REFERENCES | R I S S F I s Ay L C a d 7 | x II R F S I S s A L C y a d 4 1 | III S SIF AI L C |
|---|---|---|---|---|---|
| Passive IT/OT Network Structure/Access Control/Telephony - Interface Description | 10.11.7 | X | |||
| Passive IT/OT Network Structure/Access Control/Telephony - Services and Supplies List | 10.11.7 | X | |||
| Telecommunication and Security System Philosophy | 10.11.9 | X | |||
| Overall Telecommunication Systems Block Diagram(s) | 10.11.10 | X | |||
| PROCESS DESIGN | 10.12 | ||||
| Process Design Philosophies | 10.12.1 | X | |||
| Isolation Philosophy | 10.12.1.1 | X | |||
| Transfer Pipeline Segregation and Draining Philosophy | 10.12.1.2 | X | |||
| Emergency Shut Down Philosophy | 10.12.1.3 | X | |||
| Process Safety Philosophy | 10.12.1.4 | X | |||
| Layout and Siting Safety Philosophy | 10.12.1.5 | X | |||
| Relief, blow-down and de-pressuring philosophy | 10.12.1.6 | X | |||
| Sparing philosophy | 10.12.1.7 | X | |||
| Operating Philosophy | 10.12.1.8 | X | |||
| General Plant Inspection and Maintenance Philosophy | 10.12.1.9 | X | |||
| Winterisation Philosophy | 10.12.1.10 | X | |||
| Process Design Basis | 10.12.2 | X | |||
| Block Flow Diagrams | 10.12.3 | X | |||
| Legend sheets for PFD’s and P&ID’s | 10.12.4 | X | |||
| Process and Utility Flow Diagrams | 10.12.5 | X | |||
| Process and Utility Heat & Mass Balances | 10.12.6 | X | |||
| Terminal Boil off Calculation | 10.12.7 | X | |||
| Process Description | 10.12.8 | X | |||
| Tie-In Summary Schedule | 10.12.9 | X | |||
| Material Selection Philosophy and Report | 10.12.10 | X | |||
| Material Selection Diagram(s) | 10.12.11 | X | |||
| Piping and Instrumentation Diagrams | 10.12.12 | X | |||
| Utility Consumption Summary | 10.12.13 | X | |||
| First Fill, Catalyst and Chemicals and Consumables List | 10.12.14 | X | |||
| List of pressure relief, blow-down and thermal relief valves | 10.12.15 | X | |||
| Line List | 10.12.16 | X | |||
| Pipeline Hydraulic Analysis & Report (Surge Analysis) | 10.12.17 | X | |||
| Dynamic Simulation Study Report for the Hydrogen Compressors | 10.12.18 | DocumentpreparedbyCracker-FEEDContractor(noTerminal-FEEDContractor deliverable), butsupported byTerminal-FEEDcontractor's deliverables and input | |||
| Flare and Depressurization Report | 10.12.19 | X | |||
| Process and Mechanical Data Sheets and Equipment Specifications | 10.12.20 | X | |||
| Equipment Specifications and Packaged Equipment Specifications | 10.12.20.1 | ||||
| General Data required for Process and mechanical data sheets | 10.12.20.2 | ||||
| Heat Exchangers, Air Coolers and Electric Heaters | 10.12.20.3 | ||||
| Pumps | 10.12.20.4 | ||||
| Vessels and Columns | 10.12.20.5 | ||||
| Reactors | 10.12.20.6 | ||||
| Fired Heaters | 10.12.20.7 | ||||
| Stacks and Gas Ducts | 10.12.20.8 | ||||
| Compressors/Blowers/Fans | 10.12.20.9 | ||||
| Storage/Mixing/Day Tanks | 10.12.20.10 | ||||
| Filters | 10.12.20.11 | ||||
| Flares | 10.12.20.12 | ||||
| Cotrol Loop Description Report | 10.12.21 | X | |||
| Cause and Effect Diagrams | 10.12.22 | X | |||
| Alarm and Trip Schedule | 10.12.23 | X | |||
| Reliability, Availability and Maintenance (RAM) Study | 10.12.24 | X | |||
| Sized Equipment List | 10.12.25 | X | |||
| List of Spares | 10.12.26 | X | |||
| Process Simulations | 10.12.27 | X | |||
| Civil, Structural, Architecture | 10.13 | ||||
| Civil Design Basis | 10.13.1 | X | |||
| Specification and Scope of Work for geotechnical and topographic investigations | 10.13.2 | X | |||
| Civil Interface Register | 10.13.3 | X | |||
| Site Grading Layout | 10.13.4 | X | |||
| Earthworks Quantification Report | 10.13.5 | X | |||
| Flood Protection Concept (TRAS 310) | 10.13.6 | X | |||
| Foundation Design Report | 10.13.7 | X | |||
| Foundation Layout Drawings | 10.13.8 | X | |||
| Dynamic & Special Foundation and Piling Assessment | 10.13.9 | X | |||
| Pile Design Basis and Testing Strategy | 10.13.10 | X | |||
| Piling Layout Drawings | 10.13.11 | X | |||
| Pile Schedule | 10.13.12 | X | |||
| Building Schedule and Room Book | 10.13.13 | X | |||
| Building General Arrangement Drawings | 10.13.14 | X | |||
| Structural Design Basis | 10.13.15 | X | |||
| Structural Calculations | 10.13.16 | X | |||
| Structural General Arrangement Drawings | 10.13.17 | X | |||
| Road & Pavement Design Report | 10.13.18 | X | |||
| Road and Hardstanding Layout Drawings | 10.13.19 | X | |||
| Rail system design report | 10.13.20 | X | |||
| Drainage & Water Management Concept | 10.13.21 | X |
Printed: 01.07.2026 5 / 6
ebb_26_78434781_3549076486
| DELIVERABLE | ITT Scope of Work chapter | DESCRIPTION / NOTES / CORRESPONDING REFERENCES | R I S S F I s Ay L C a d 7 | x II R F S I S s A L C y a d 4 1 | III S SIF AI L C |
|---|---|---|---|---|---|
| Marine | 10.14 | ||||
| Design Requirements for Marine Infrastructure | 10.14.1 | X | |||
| Marine Equipment Design Report | 10.14.2 | X | |||
| Pre-Commissioning, Commissioning, Start-up, Training, Performace | 10.15 | ||||
| Pre-Commissioning Philosophy | 10.15.1 | X | |||
| Commissioning Philosophy | 10.15.2 | X | |||
| Start-up Philosophy | 10.15.3 | X | |||
| Training Philosophy | 10.15.4 | X | |||
| Performance Test Run Philosophy | 10.15.5 | X | |||
| Performance Guarantees Summary Philosophy | 10.15.6 | X |